Nashik, Maharashtra · Turnkey PEB design, supply & erection
Aerial view of an Orion pre-engineered building frame during erection
Systems showcase

Engineered end to end, for the people who have to sign off on it.

Spans, materials and structural highlights, written for the procurement and project teams evaluating a PEB partner — not a general audience.

01 / Design, supply, erection

Engineered end to end

Three stages, one contract. Nothing handed off, nothing lost between vendors.

Every layout begins with precision load mapping for wind, seismic zone and internal crane duty.

  • Structural stress simulation modelling
  • General Arrangement blueprints
  • Statutory approval drawing packs
  • Granular fabrication shop sheets
Fig. 03 — GA elevation, portal frameC.01 / C.03
02 / Why steel, why Orion

Why steel, why Orion

Pre-engineered steel halves the conventional build lifecycle. Doing it properly is what separates a shed from a structure.

A.01

Fast execution

Factory fabrication runs in parallel with civil foundation work, cutting deployment time well below a conventional concrete frame.

A.02

Optimised design

Frame drafting strips out dead weight — better seismic performance, wider usable floor, and less steel to pay for.

A.03

Cost control

Millimetric cutting lines eliminate offcut waste, and single-contract delivery keeps the budget clear of local labour markups.

A.04

Quality materials

Members are cold-rolled and finished in controlled plant conditions, conforming to Indian Standard structural criteria.

A.05

Safety first

Fall-arrest harness rigging, overhead line discipline and strict PPE enforcement on every erection front, every day.

A.06

End to end

Structural design, plate supply, sequenced shipment and crane assembly — handled by one accountable team.

03 / Anatomy

What a pre-engineered building is made of

Four systems, each dimensioned before it is cut, combining under calculated tension and load to produce a rigid industrial space.

Labelled cutaway diagram of an Orion pre-engineered building showing primary frame, purlins, cladding and structural utilities
D.01

Primary frame

Heavy tapered columns and rafter splices engineered to accept maximum load distribution.

D.02

Secondary rows

Interlocking longitudinal Z-purlins and C-girts holding global structural alignment.

D.03

Cladding system

Coated galvalume protective panels fitted with engineered sky-lighting sheets.

D.04

Structural utilities

Mezzanine platforms, crane runway brackets and weather-sealed entrance canopies.

04 / Configurations & sectors

Five configurations, one engineering method

Every Orion structure starts from the same discipline and is configured to the use case in front of it.

Interior purlin and frame rows during Orion site erection
Fig. 04 — Purlin rows, laser-aligned

Optimally designed clear-span layouts that eliminate interior column arrays entirely, so the full floor plate stays available for plant and racking.

Sectors served
Manufacturing plants
Logistics & warehousing
Agricultural infrastructure
FMCG & cold chain
Automobile showrooms
Heavy engineering